Project overview

3 Hardman Square, Greater Manchester

After previously sub-dividing the 4th floor at 3 Hardman Square to facilitate an incoming tenant, we were appointed again to provide an enhanced CAT A refurbishment of the remaining vacant space.

KEY FEATURES:

SectorOffice
ClientRoyal London
Size0 - 50,000 SQ FT
LocationNorth West

Our Approach

This Cat A refurbishment project saw everything from plasterboard, flooring tiles, glass, timber and metal being recycled or repurposed rather than traditionally being sent to landfill. We worked in partnership with Tarkett, an approved flooring recycling and manufacturing company, and we ensured 100% of all flooring tiles we remove from the fit-out project are being recycled and repurposed for use in the future.

The sustainability factor isn’t only focussed on the items being stripped out of the building, we also introduced new flooring products which are made from 93% recycled materials and the introduction of ultra-LED lighting which uses 60% less power than traditional halogen or incandescent bulbs. The ultra-LED lights have a 3.5x the lifetime of traditional lighting, making them cost effective and increasing light outputs.
This project was hugely important to us, and we haven’t passed on any noticeable costs to our client by introducing these additional sustainability measures. It has given us a blue print to use with future clients, helping them to address their sustainability targets. We have since been appointed on several further schemes.

Let's Work 
Together

Interested in starting 
a fantastic project together?
Get in touch
Manchester Office
Watson House
45 Waterloo Rd
Stockport
SK1 3BJ
Leeds Office
Joseph's Well
Hanover Walk
Park Lane
Leeds
LS3 1AB
crossmenu